{"id":929,"date":"2026-10-09T12:02:57","date_gmt":"2026-10-09T12:02:57","guid":{"rendered":"https:\/\/www.interviewbit.com\/varsity\/blog\/?p=929"},"modified":"2026-10-09T12:03:01","modified_gmt":"2026-10-09T12:03:01","slug":"dmaic-methodology","status":"publish","type":"post","link":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/","title":{"rendered":"DMAIC Methodology: The 5 Phases of Six Sigma Explained with Examples"},"content":{"rendered":"\n<div class=\"wp-block-group vlf-insights is-layout-flow wp-block-group-is-layout-flow\">\n<p class=\"vlf-insights-title wp-block-paragraph\">Key Insights<\/p>\n\n\n\n<ul class=\"wp-block-list vlf-insights-list\">\n<li>DMAIC is a structured approach to fixing existing process problems: It is designed for processes that already exist but suffer from defects, delays, errors, variation, or inconsistent performance.<\/li>\n\n\n\n<li>Each phase answers a different question: Define identifies what needs to improve, Measure establishes how large the problem is, Analyze determines why it is happening, Improve tests what should change, and Control ensures the improvement lasts.<\/li>\n\n\n\n<li>Data drives the decision-making: DMAIC relies on measured performance and verified root causes rather than assumptions or quick fixes.<\/li>\n\n\n\n<li>The Measure phase creates the baseline: Without a reliable baseline, teams cannot determine whether an improvement has actually worked.<\/li>\n\n\n\n<li>The Analyze phase prevents symptom-based solutions: Teams investigate and verify root causes before selecting an improvement, reducing the risk of solving the wrong problem.<\/li>\n\n\n\n<li>Improvements should be tested before full implementation: Pilot testing allows teams to validate a solution and identify potential risks before rolling it out across the process.<\/li>\n\n\n\n<li>Control makes improvement sustainable: Control plans, monitoring, standard operating procedures, and performance tracking help prevent the process from returning to its previous state.<\/li>\n\n\n\n<li>DMAIC is applicable beyond manufacturing: The methodology can be adapted to logistics, healthcare, banking, IT, e-commerce, customer service, and other measurable business processes.<\/li>\n\n\n\n<li>DMAIC is different from DMADV: DMAIC improves an existing process, while DMADV is better suited to designing a new process or product or when an existing process requires a fundamental redesign.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">DMAIC methodology is a five-phase, data-driven framework used in Six Sigma to improve an existing process. The name stands for Define, Measure, Analyze, Improve, and Control. Together, the phases take a team from a clearly stated problem to a verified root cause, a tested solution, and lasting results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before looking at each phase in detail, here are the essentials of the DMAIC process at a glance:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Full form: Define, Measure, Analyze, Improve, Control, always completed in that order.<\/li>\n\n\n\n<li>Main purpose: improving processes that already exist but underperform, such as those with frequent defects, delays, or errors.<\/li>\n\n\n\n<li>Core logic: each phase answers one question: what needs to improve, how big the problem is, why it happens, what should change, and how to keep the gains.<\/li>\n\n\n\n<li>Guiding principle: decisions rely on measured data and verified causes, not assumptions or quick fixes.<\/li>\n\n\n\n<li>Where it applies: manufacturing, logistics, e-commerce, healthcare, banking, IT, and other service processes.<\/li>\n\n\n\n<li>When not to use it: designing a brand-new process or product, which is better suited to DMADV.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">In short, DMAIC gives teams a repeatable way to solve process problems with evidence. The sections below explain each of the 5 phases of DMAIC using one running example: an e-commerce company struggling with late deliveries.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What are the 5 Phases of DMAIC in Six Sigma? Define, Measure, Analyse, Improve, and Control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The five DMAIC phases run in a fixed order, and each one builds on the output of the phase before it. A team cannot choose a solution until it has measured the problem and confirmed the cause.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"512\" src=\"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13-1024x512.png\" alt=\"the 5 Phases of DMAIC in Six Sigma\" class=\"wp-image-1064\" style=\"aspect-ratio:2;width:624px;height:auto\" srcset=\"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13-1024x512.png 1024w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13-300x150.png 300w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13-1536x768.png 1536w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13-768x384.png 768w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-13.png 1774w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Each phase has its own purpose and answers a different question. The table below shows how the phases connect, from identifying a problem to maintaining the solution.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Phase<\/td><td>Purpose<\/td><td>Key question<\/td><\/tr><tr><td>Define<\/td><td>Clarify the problem, scope, and goal<\/td><td>What needs to improve?<\/td><\/tr><tr><td>Measure<\/td><td>Quantify current performance and set a baseline<\/td><td>How big is the problem?<\/td><\/tr><tr><td>Analyze<\/td><td>Find and verify the root cause<\/td><td>Why is it happening?<\/td><\/tr><tr><td>Improve<\/td><td>Develop, test, and implement solutions<\/td><td>What should change?<\/td><\/tr><tr><td>Control<\/td><td>Sustain the gains over time<\/td><td>How do we maintain the improvement?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">To show how these phases work in practice, each section below follows the same scenario: an e-commerce company with a high rate of late deliveries. The example and all of its figures are illustrative, not data from a real company.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Define Phase of DMAIC: How to Identify the Problem, Scope, and Improvement Goal<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Define phase sets the direction for the whole project. It turns a vague concern, such as &#8220;customers are unhappy,&#8221; into a specific problem the team can measure and solve.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A weak Define phase often produces a project that is too broad or chases the wrong issue. To prevent that, the team agrees on five points before moving on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Problem statement: what is going wrong, where, and how it affects customers or the business.<\/li>\n\n\n\n<li>Project scope: which part of the process is included and what is excluded.<\/li>\n\n\n\n<li>Improvement goal: a measurable target with a deadline.<\/li>\n\n\n\n<li>Customer requirements: what customers expect, stated in measurable terms.<\/li>\n\n\n\n<li>Stakeholders: the process owner, the project sponsor, and the teams affected by any change.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Example: The e-commerce company sees rising complaints about orders arriving after the promised date. The team defines the problem as too many orders missing their promised delivery date, scoped to domestic orders shipped from its main warehouse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Customer feedback shows that buyers care most about receiving orders on the date promised at checkout. The team sets a goal to cut the late-delivery rate to below 5% within six months, with warehouse, courier, and customer service leads as stakeholders.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Three tools support this phase. A Project Charter captures the problem, scope, goal, team, and timeline on one page.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A SIPOC diagram (Suppliers, Inputs, Process, Outputs, Customers) gives a high-level view of the order-to-delivery process. Voice of the Customer (VOC) data turns complaints and survey feedback into clear requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the problem and goal agreed, the next step is to find out how large the problem really is.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Measure Phase of DMAIC: How to Establish a Process Performance Baseline<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Measure phase shows how the process performs today. It replaces opinions with data and creates a baseline that every later improvement is compared against.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Without a reliable starting point, a team cannot prove that anything improved. In this phase, the team typically:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Maps the current process step by step.<\/li>\n\n\n\n<li>Defines exactly what counts as a defect.<\/li>\n\n\n\n<li>Collects data on current performance.<\/li>\n\n\n\n<li>Checks that the measurement method is accurate and consistent.<\/li>\n\n\n\n<li>Records the baseline.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Example: The team defines a late delivery as any order that arrives after the date promised at checkout. It maps the journey from order placement to doorstep, then collects four weeks of data from the warehouse system and courier tracking records.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The table below shows an illustrative baseline. The figures are hypothetical and simply show what a Measure-phase baseline can look like.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Metric<\/td><td>Baseline (illustrative)<\/td><td>What it shows<\/td><\/tr><tr><td>Orders shipped in 4 weeks<\/td><td>20,000<\/td><td>Size of the data sample<\/td><\/tr><tr><td>Late deliveries<\/td><td>2,400<\/td><td>Number of defects<\/td><\/tr><tr><td>Late-delivery rate<\/td><td>12%<\/td><td>Current gap vs. the 5% goal<\/td><\/tr><tr><td>Average delay on late orders<\/td><td>1.8 days<\/td><td>How severe the delays are<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A Process Map documents each step and handoff, while a Check Sheet offers a simple way to tally where and when delays occur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Measurement System Analysis (MSA) confirms the data is trustworthy, for example that warehouse and courier timestamps agree.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The baseline confirms the problem is real and sizable. The next question is why it is happening.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Analyse Phase of DMAIC: How to Identify and Verify the Root Cause<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Analyze phase finds the root cause of the problem. Instead of treating symptoms, the team uses data to pinpoint what actually drives the defects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The usual approach is to list every possible cause, narrow the list, and verify the most likely ones with data. Only a verified cause moves forward to the Improve phase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example: The team lists possible causes of late deliveries: warehouse delays, items out of stock, courier pickup or transit problems, and incorrect addresses. A Fishbone Diagram groups these candidates into categories such as people, methods, materials, and equipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Next, a Pareto Chart ranks late orders by where the delay happened. In this illustrative case, most delays occur before the parcel ever reaches the courier, because orders miss the daily pickup cutoff.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hypothesis Testing, a statistical check of whether a difference is real or due to chance, confirms the pattern. Orders placed after the warehouse&#8217;s single daily picking batch are far more likely to arrive late, while courier transit times show no meaningful difference.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, the team applies the 5 Whys, asking &#8220;why&#8221; repeatedly until it reaches the underlying cause. This stops the analysis from ending at the first, most visible explanation:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Why are orders late? They miss the courier pickup.<\/li>\n\n\n\n<li>Why do they miss the pickup? They are not packed by the cutoff time.<\/li>\n\n\n\n<li>Why are they not packed in time? Orders are picked in one large batch per shift.<\/li>\n\n\n\n<li>Why only one batch per shift? The workflow was designed for much lower order volumes.<\/li>\n\n\n\n<li>Why was it never changed? No one reviewed the picking process as volumes grew.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The verified root cause is a picking workflow that has not kept pace with order volume. Switching couriers, which first looked like the obvious fix, would not have solved it.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Improve Phase of DMAIC: How to Develop, Test, and Implement Process Improvements<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Improve phase develops and implements changes that remove the verified root cause. The aim is to close the gap between the baseline and the target, not simply to try new ideas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Solutions are tested on a small scale first. A pilot shows whether a change works and exposes side effects before the whole operation depends on it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example: The team weighs options such as hiring temporary staff, adding a second courier, and redesigning the picking workflow. Because the analysis pointed to picking, it chooses a revised warehouse workflow with two changes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Orders are picked in smaller waves every two hours instead of one large batch per shift.<\/li>\n\n\n\n<li>Orders closest to the courier cutoff are flagged and picked first.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Pilot Testing runs the new workflow in one warehouse zone for four weeks. In this illustrative scenario, the pilot zone&#8217;s late-delivery rate falls from 12% to about 4%, beating the 5% goal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before full rollout, the team completes an FMEA (Failure Mode and Effects Analysis), which lists the ways a change could fail and ranks them by risk. Risks such as picker overload during sale events get safeguards before the workflow goes live warehouse-wide.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An improvement only matters if it lasts, which is the job of the final phase.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Control Phase of DMAIC: How to Sustain and Monitor Process Improvements<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Control phase makes sure the improvement holds after the project team steps away. Without it, a process can easily drift back to its old habits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This phase locks in the new way of working. The team sets up monitoring, documents the new standard, and hands the process to the person who will own it day to day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example: The company tracks its daily late-delivery rate on a Control Chart, a time-based graph with limits that signal when performance moves outside its normal range. A spike now shows up quickly instead of surfacing weeks later through complaints.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A Control Plan spells out who owns the metric, how often it is reviewed, and what to do if the rate rises above an agreed level. Here, the warehouse operations manager takes ownership.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Standard Operating Procedures (SOPs) document the wave-picking workflow, so new staff learn the improved method from day one. Once the rate stays stable below 5%, the project formally closes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DMAIC Process Example: How the 5 Phases Work Together to Improve Late Deliveries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Seen end to end, a DMAIC project is a chain of evidence. Each phase hands a specific output to the next, which is why skipping a phase usually weakens the final result.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-14-1024x683.png\" alt=\"DMAIC Process Example\" class=\"wp-image-1066\" style=\"aspect-ratio:1.5;width:624px;height:auto\" srcset=\"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-14-1024x683.png 1024w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-14-300x200.png 300w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-14-768x512.png 768w, https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/image-14.png 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The table below summarizes how the illustrative late-delivery project moved from problem to lasting result. Notice how each outcome becomes the starting point for the next phase.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>DMAIC Phase<\/td><td>Example outcome<\/td><\/tr><tr><td>Define<\/td><td>Goal set: cut late deliveries to below 5% within six months<\/td><\/tr><tr><td>Measure<\/td><td>Baseline confirmed: 12% late-delivery rate over four weeks<\/td><\/tr><tr><td>Analyze<\/td><td>Root cause verified: single-batch picking makes orders miss the courier cutoff<\/td><\/tr><tr><td>Improve<\/td><td>Two-hour picking waves piloted, risk-checked, and rolled out<\/td><\/tr><tr><td>Control<\/td><td>Control chart, control plan, and SOPs keep the rate below target<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The key lesson from this DMAIC process example is that the solution came from the data, not from the first idea. A courier switch would have been faster to announce, but it would have left the real cause untouched.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DMAIC Tools by Phase: Six Sigma Tools Used in Define, Measure, Analyse, Improve, and Control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">DMAIC tools help a team gather evidence and make decisions at each stage. No project uses every tool; teams choose the ones that fit the problem and the data available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The table below groups the tools most often linked to each phase, along with what they help the team achieve. Use it as a quick reference when planning a DMAIC project.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>DMAIC Phase<\/td><td>Common Tools<\/td><td>What they help with<\/td><\/tr><tr><td>Define<\/td><td>Project Charter, SIPOC, Voice of the Customer<\/td><td>Framing the problem, scope, and customer needs<\/td><\/tr><tr><td>Measure<\/td><td>Process Map, Check Sheet, MSA<\/td><td>Documenting the process and collecting reliable baseline data<\/td><\/tr><tr><td>Analyze<\/td><td>Fishbone Diagram, 5 Whys, Pareto Chart, Hypothesis Testing<\/td><td>Finding and verifying root causes<\/td><\/tr><tr><td>Improve<\/td><td>Pilot Testing, FMEA<\/td><td>Testing solutions and reducing rollout risk<\/td><\/tr><tr><td>Control<\/td><td>Control Charts, Control Plan, SOPs<\/td><td>Monitoring results and standardizing the new process<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Tools support a phase; they never replace its purpose. A Pareto chart, for instance, is only useful in Analyze if it helps explain why the problem is happening.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DMAIC vs DMADV vs PDCA: Differences, Uses, and When to Choose Each Methodology<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">DMAIC is not the only structured improvement approach. DMADV (Define, Measure, Analyze, Design, Verify) and PDCA (Plan, Do, Check, Act) are often mentioned alongside it, but each suits a different situation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main difference lies in whether a process already exists and how large the change needs to be. The table below shows the main use of each approach and when it fits best.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Methodology<\/td><td>Main use<\/td><td>Best fit when<\/td><\/tr><tr><td>DMAIC<\/td><td>Improve an existing process<\/td><td>A current process underperforms and the cause is unclear<\/td><\/tr><tr><td>DMADV<\/td><td>Design or redesign a process<\/td><td>No process exists, or the current one cannot meet requirements<\/td><\/tr><tr><td>PDCA<\/td><td>Iterative process improvement<\/td><td>Small changes are tested and refined in quick, repeated cycles<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In the late-delivery example, DMAIC fits because the warehouse process already existed and needed fixing. If the company were building a new fulfillment center from scratch, DMADV would be the better choice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Want to learn how AI can transform business operations and improve processes? Explore the <a href=\"https:\/\/www.interviewbit.com\/varsity\/iim-trichy\/ai-operations\">Certificate Programme in AI-Powered Operations &amp; Process Transformation<\/a><a href=\"https:\/\/www.interviewbit.com\/varsity\/iim-trichy\/ai-operations\"> <\/a> from IIM Tiruchirappalli.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions About DMAIC Methodology<\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">When should a company use DMAIC?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">DMAIC is useful when an existing process is producing recurring problems such as defects, delays, errors, waste, or inconsistent results, and the underlying cause is not yet clear. It is most useful when the problem can be measured and improved systematically.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">What are the key deliverables in each DMAIC phase?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Each phase produces an output that supports the next step. Define establishes the problem and project scope, Measure creates the baseline, Analyze identifies verified causes, Improve tests the solution, and Control establishes the monitoring and standards needed to sustain the result.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">Who is responsible for a DMAIC project?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A DMAIC project typically involves a cross-functional team rather than one person working alone. Depending on the organisation, roles may include a process owner, project sponsor, Six Sigma practitioner, subject-matter experts, and employees who work directly within the process.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">What metrics should be measured in a DMAIC project?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The right metrics depend on the process and problem being investigated. Common measures include defect rate, cycle time, process variation, throughput, error rate, waiting time, customer complaints, and cost. The selected metrics should directly reflect the problem defined at the start of the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">How do you know if a DMAIC improvement actually worked?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An improvement should be compared against the baseline established during the Measure phase. Teams can evaluate whether the target was achieved using relevant performance metrics and then continue monitoring the process during Control to determine whether the improvement remains stable.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">Can DMAIC be used for service and business processes?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. DMAIC can be applied to measurable processes outside manufacturing, including logistics, healthcare, banking, IT, customer service, e-commerce, and other business operations. The same five-phase logic can be adapted to the type of process and data available.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">What happens if the root cause is not found during the Analyse phase?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The team should not move directly to a solution based on an unverified assumption. It may need to collect additional data, investigate other possible causes, or refine the analysis until there is sufficient evidence linking the cause to the problem.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">Can DMAIC be used for continuous improvement?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. DMAIC can support continuous improvement by providing a structured way to investigate significant or recurring process problems. Once an improvement is stabilised through the Control phase, new performance gaps can become the starting point for another improvement project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/committee.iso.org\/cms\/live\/live\/en\/sites\/isoorg\/contents\/data\/standard\/05\/29\/52901.html\">ISO \u2013 ISO 13053-1:2011: DMAIC Methodology<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.nist.gov\/baldrige\/lean-iso-and-six-sigma\">NIST \u2013 Lean, ISO, and Six Sigma<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/asq.org\/quality-resources\/sixsigma\/tools\">ASQ \u2013 Six Sigma Tools and Techniques<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/asq.org\/quality-resources\/control-chart\">ASQ \u2013 Control Charts<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/asq.org\/quality-resources\/seven-basic-quality-tools\">ASQ \u2013 Seven Basic Quality Tools<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Key Insights DMAIC methodology is a five-phase, data-driven framework used in Six Sigma to improve an existing process. The name stands for Define, Measure, Analyze, Improve, and Control. Together, the phases take a team from a clearly stated problem to a verified root cause, a tested solution, and lasting results. Before looking at each phase [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":1067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"class_list":["post-929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-operations"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"acf":{"reviewed_by":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>DMAIC Methodology: 5 Phases of Six Sigma Explained<\/title>\n<meta name=\"description\" content=\"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DMAIC Methodology: 5 Phases of Six Sigma Explained\" \/>\n<meta property=\"og:description\" content=\"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/\" \/>\n<meta property=\"og:site_name\" content=\"Varsity Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-09T12:02:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T12:03:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1010\" \/>\n\t<meta property=\"og:image:height\" content=\"673\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Varsity On Behalf Of IIM Tiruchirappalli\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Varsity On Behalf Of IIM Tiruchirappalli\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/\"},\"author\":{\"name\":\"Varsity On Behalf Of IIM Tiruchirappalli\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#\\\/schema\\\/person\\\/269e65086ea4ed2dbb1b07d62e22f449\"},\"headline\":\"DMAIC Methodology: The 5 Phases of Six Sigma Explained with Examples\",\"datePublished\":\"2026-10-09T12:02:57+00:00\",\"dateModified\":\"2026-10-09T12:03:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/\"},\"wordCount\":2785,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/dmaic-methodology.webp\",\"articleSection\":[\"Business Operations\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/\",\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/\",\"name\":\"DMAIC Methodology: 5 Phases of Six Sigma Explained\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/dmaic-methodology.webp\",\"datePublished\":\"2026-10-09T12:02:57+00:00\",\"dateModified\":\"2026-10-09T12:03:01+00:00\",\"description\":\"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/dmaic-methodology.webp\",\"contentUrl\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/dmaic-methodology.webp\",\"width\":1010,\"height\":673,\"caption\":\"dmaic methodology\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/dmaic-methodology\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DMAIC Methodology: The 5 Phases of Six Sigma Explained with Examples\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/\",\"name\":\"Varsity Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#organization\",\"name\":\"Varsity Blog\",\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/varsity-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/varsity-logo.png\",\"width\":275,\"height\":64,\"caption\":\"Varsity Blog\"},\"image\":{\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/varsity-by-interviewbit\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/#\\\/schema\\\/person\\\/269e65086ea4ed2dbb1b07d62e22f449\",\"name\":\"Varsity On Behalf Of IIM Tiruchirappalli\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g\",\"caption\":\"Varsity On Behalf Of IIM Tiruchirappalli\"},\"url\":\"https:\\\/\\\/www.interviewbit.com\\\/varsity\\\/blog\\\/author\\\/varsity-on-behalf-of-iim-tiruchirappalli\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"DMAIC Methodology: 5 Phases of Six Sigma Explained","description":"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/","og_locale":"en_US","og_type":"article","og_title":"DMAIC Methodology: 5 Phases of Six Sigma Explained","og_description":"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.","og_url":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/","og_site_name":"Varsity Blog","article_published_time":"2026-10-09T12:02:57+00:00","article_modified_time":"2026-10-09T12:03:01+00:00","og_image":[{"width":1010,"height":673,"url":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp","type":"image\/webp"}],"author":"Varsity On Behalf Of IIM Tiruchirappalli","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Varsity On Behalf Of IIM Tiruchirappalli","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#article","isPartOf":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/"},"author":{"name":"Varsity On Behalf Of IIM Tiruchirappalli","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#\/schema\/person\/269e65086ea4ed2dbb1b07d62e22f449"},"headline":"DMAIC Methodology: The 5 Phases of Six Sigma Explained with Examples","datePublished":"2026-10-09T12:02:57+00:00","dateModified":"2026-10-09T12:03:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/"},"wordCount":2785,"commentCount":0,"publisher":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#organization"},"image":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#primaryimage"},"thumbnailUrl":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp","articleSection":["Business Operations"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/","url":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/","name":"DMAIC Methodology: 5 Phases of Six Sigma Explained","isPartOf":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#primaryimage"},"image":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#primaryimage"},"thumbnailUrl":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp","datePublished":"2026-10-09T12:02:57+00:00","dateModified":"2026-10-09T12:03:01+00:00","description":"Learn the DMAIC methodology in Six Sigma, explore its 5 phases: Define, Measure, Analyze, Improve, and Control and understand each with practical examples.","breadcrumb":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#primaryimage","url":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp","contentUrl":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/10\/dmaic-methodology.webp","width":1010,"height":673,"caption":"dmaic methodology"},{"@type":"BreadcrumbList","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/dmaic-methodology\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.interviewbit.com\/varsity\/blog\/"},{"@type":"ListItem","position":2,"name":"DMAIC Methodology: The 5 Phases of Six Sigma Explained with Examples"}]},{"@type":"WebSite","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#website","url":"https:\/\/www.interviewbit.com\/varsity\/blog\/","name":"Varsity Blog","description":"","publisher":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.interviewbit.com\/varsity\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#organization","name":"Varsity Blog","url":"https:\/\/www.interviewbit.com\/varsity\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/08\/varsity-logo.png","contentUrl":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-content\/uploads\/2026\/08\/varsity-logo.png","width":275,"height":64,"caption":"Varsity Blog"},"image":{"@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/varsity-by-interviewbit\/"]},{"@type":"Person","@id":"https:\/\/www.interviewbit.com\/varsity\/blog\/#\/schema\/person\/269e65086ea4ed2dbb1b07d62e22f449","name":"Varsity On Behalf Of IIM Tiruchirappalli","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d23059e7096116ed974df9344c7697d036b38453fe45146ff2a1721f0c3cf93a?s=96&d=mm&r=g","caption":"Varsity On Behalf Of IIM Tiruchirappalli"},"url":"https:\/\/www.interviewbit.com\/varsity\/blog\/author\/varsity-on-behalf-of-iim-tiruchirappalli\/"}]}},"_links":{"self":[{"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/posts\/929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/comments?post=929"}],"version-history":[{"count":4,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/posts\/929\/revisions"}],"predecessor-version":[{"id":1068,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/posts\/929\/revisions\/1068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/media\/1067"}],"wp:attachment":[{"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/media?parent=929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/categories?post=929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.interviewbit.com\/varsity\/blog\/wp-json\/wp\/v2\/tags?post=929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}